Monday, March 7, 2022

The Mess Is Piling Up

    The electrians were here last week and are now here this week.  The house is being rewired, so we now have a lot of holes in walls that weren't there before.  
 

   The old 100 amp meters have been torn off the back wall and the new meter, 200 amps, was put up today.  That big propane tank will be moved, but needed to keep it as the tankless water heating system will be run with propane, more cost efficient.
                     This ugly water tank was in the kitchen, now on the back porch to be taken away and freeing up a nice space in the kitchen where an antique cupboard could go.
                                The new tankless water heater affixed to the back of the house. 
The new electric heating system is also affixed to the back of the house.


The system is in the attic space over the kitchen that was not vaulted, so much better than in a crawl space.
                           


                             The vents have been cut in all the rooms to be vented.
                The new wiring in the kitchen.


    The cabinet for the sink arrived.  I also got the antique knobs I ordered from Ebay.  I have antique butcher blocks that I hope to use on the top sides of the sink.
    Up at the main house the garden is coming into bloom, the daffodils are out, the mock orange bushes smell wonderful and things are in much better order! 

No comments: